Steps to Building the Perfect Pool
Once we have completed the design of
your pool, we move to the construction phase. Our goal is
to make this a pleasant and fun experience for the new
pool owner.
Step 1: Permit
Your pool design is submitted to the county for
approval. Prior to the issuance of the permit, we
visit your site to verify all measurements are
correct and in compliance with all regulations.
We then review the final approved layout and
begin construction after the permit is issued.
Step 2: Layout
Your pool is staked out to the final plan. The
pool will be laid out larger than the plan to
allow for the thickness of the concrete.
Step 3: Excavation and Steel Reinforcement
After excavation, steel reinforcement is placed
and rough plumbing is installed.
Step 4: Shotcrete Application
Our shotcrete crew pneumatically places the
concrete to create the shape and structure of
your pool.
Step 5: Rough Grade and Plumbing
With the concrete shell in place, the deck area
is graded and compacted to reduce concrete
cracking. Next, the remainder of the plumbing is
installed. Finally, the pipes are pressure tested
to assure there are no leaks.
Step 6: Deck Construction
Our deck crew then forms and pours the deck.
Within 24 hours, the deck is saw cut to reduce
cracking.
Step 7: Brick and Tile
If brick coping is chosen, it is installed before
the deck is poured. If tile is chosen, it is
installed after the deck is poured at water
level.
Step 8: Deck Topping
If acrylic decking is chosen, the texture is
applied along with the color coat.
Step 9: Pool Equipment
The equipment is now installed, utilizing our
partner companies with the best warranties in the
industry.
Step 10: Pool Finish
Once the final deck coating is complete, the pool
shell is cleaned and prepped for the application
of the pool finish. Immediately after the pool
finish is applied, the pool begins filling from a
regular garden hose.
Step 11: Cage
This phase is completed at the very end of
construction.
Step 12: Final Grade and Startup
The yard is graded and cleaned. Our trained staff
then begins to brush the pool and apply chemical
treatment, which takes several days to balance.
In our effort to provide our customers with
excellent service, we offer a "pool school". If
your home is a new construction and after you are
moved in, please call us to schedule a time for
one of our pool pros to instruct you on the
proper operation and maintenance of your new
pool. This will insure you many years of
trouble-free enjoyment and relaxation.